General Description
Outfitted with the zero leak bidirectional checking sole-noid valves, this energy unit is built for the operation of two independent circuits. Which are respectively for the most important and subordinate platforms on the double scissors lift. Two cut-off valves are applied for decreasing the machine manually in situation of electrical power loss. If a lot more independent circuits are necessary for your application please get in touch with us for availability.
Remark: 1. Please check with our product sales engineer to the diverse pump displacement, motor power or tank capacity.
2. CSA or UL licensed motors can be found on request.
Distinctive Notes
one. The AC motor is of S3 duty cycle, which might only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned just before installation of the electrical power unit.
3. Viscosity from the oil shoud be 15~46 cst,plus the oil must be clean and absolutely free of impurities,N46 hydraulic oil is advised.
four. The power unit need to be mounted vertically.
five. Check the oil degree during the tank just after the preliminary working from the power unit.
6. Oil altering is needed just after the preliminary 100 operation hours,afterwards after each and every 3000 hours.